New Pavement, Sidewalk and Curb, Avid Hotel, Charlotte NC

Finished concrete flatwork at the hotel building entrance

A hotel lot has two jobs at once. It has to look immaculate at the door, because it is the first surface a guest touches, and it has to carry service and delivery traffic round the back without falling apart.

That is why this one was built in two specifications. 37,850 square feet went down light duty at 1.5 inches on a 6 inch stone base, and the areas taking heavier loads got 3,850 square feet at 2.5 inches on 8 inches of stone. Curb reveal was set differently for each so both finished flush.

The concrete package is the larger half of this job: 8,800 square feet of sidewalk, 1,950 linear feet of 18 inch curb and gutter, a reinforced dumpster pad, a Type II driveway, and five ADA ramps with truncated domes. Crown also built the off-site tie-in full depth, base through surface, so the transition into the right of way was not left as somebody else's problem.

Sidewalk run poured alongside new curb during construction
Sidewalk run poured alongside new curb during construction

Scope of Work

  • 37,850 SF of light-duty surface at 1.5 inches on a 6 inch stone base
  • 3,850 SF of heavy-duty surface at 2.5 inches on an 8 inch stone base
  • 1,420 tons of ABC at 6 inches, 193 tons at 8 inches
  • 8,800 SF of 4 inch sidewalk
  • 1,950 LF of 18 inch curb and gutter, 200 LF of ribbon curb
  • 1,250 SF of Type II driveway and a 650 SF dumpster pad reinforced with #4 rebar
  • Five ADA ramps with truncated domes, 4 accessible stalls, 94 standard stalls
  • Off-site work built full depth: 5 inch base, 4 inch binder, 3 inch surface
  • New sidewalk following a curved curb line at a commercial site
  • New curb and gutter set against freshly laid asphalt